We've
also had some deck railings yanked off, and are getting our carport
roof/deck re-surfaced.
In
doors it is busy, too. The master bathroom tub is gone, and the
replacement is coming. There is already a brand new sink and matching
taps installed. There is going to be a new floor, and gorgeous glass
tile wrapping the tub area.
The
kitchen floor has been redone, and the old dishwasher sent away. The
new dishwasher awaits the plumber; probably tomorrow.
We've
also bought basement flooring for me to install after I retire.
Other
future plans have the main floor bathroom getting totally redone. We
also need a new oven, as the current one is busted.
I
can't imagine how people go through this with time limits, or kids,
or limited budgets.
Anyhow,
we should have our kitchen back monetarily. The ensuite will take
longer.
That
will leave just the stuff that hasn't already begun; the basement
floor, the oven, and the middle bathroom.
Things
will be better when it's all done. I don't consider it a retirement
project of any sort. If I could wave a wand and have all the work
completed, I would.
It
all takes time.